Case study
Al Bustan Palace Hotel Ritz-Carlton
The full project consists of several pools and water features.
City: Al Bustan, Oman
Project carried out by: Al Ansari
City: Al Bustan, Oman
Project carried out by: Al Ansari
The project consists of a large infinity pool overlooking the beach, the kids pool, the two largest water lagoons in Oman and one water feature at the hotel’s entrance.
The pumps installed in the pools are FDN-126H 15HP models in cast iron with cataphoresis treatment and offer the flow rate of 241m³/h each. The IE3 motors ensure efficiency above 70% for these large flows, offering significant energy savings to the hotel.